|
E/S3 Consultants, Inc. |
|
Putting People and Projects Together SM |

|
The following is a representative sampling of projects our staff has been involved with recently, facilitating internal and external teams, and leading the development process. |
|
Description: ESPC project development through DOE Initial Proposal (feasibility) stage for energy conservation measures site-wide. Technologies included on-site generation, electrical infrastructure improvements, natural gas infrastructure, fuel conversions on heating equipment, and other facility improvements. Potential project size: $35,000,000 |
|
Project Name: US General Services Admin., Downtown Center, Denver CO |
|
Project List... |
|
©2004 E/S3 Consultants, Inc. |
|
Project Name: US General Services Admin., Denver Federal Center, Denver CO |
|
Project Name: US Army Dugway Proving Ground UT |
|
Project Name: University of Colorado Health Sciences Center, Aurora CO |
|
Project Name: VA Hospital, Salt Lake City UT |
|
Description: ESPC project for water conservation measures in 25 buildings campus-wide. Technologies included low flow fixtures, water measurement system integrated with building automation, and electronic cooling tower fill valves. Approximate size of project: $700,000 |
|
Description: ESPC project for energy conservation measures in 4 buildings. Technologies included chiller replacements, lighting retrofits, electric peak shaving, air handling unit optimization, recommissioning, and other facility improvements. Approximate size of project: $1,500,000 |
|
Description: Construction of a new Central Utility Plant for the Fitzsimons campus. Project included chillers, boilers, cooling towers, auxiliary systems, building, and other infrastructure to provide heating/cooling to this 227 acre medical campus. Approximate size of project: $25,000,000 Phase I; final build-out projected $44,000,000 |
|
Project Name: VA Hospital, Salt Lake City UT |
|
Description: Installation of card access security system integrated with Building Automation System, and an employee badging system integrated with Human Resources computer systems. Approximate size of project: $1,200,000 Phase I & 2 |
|
Description: Upgrade of fire alarm system, integrated with Building Automation System for secondary reporting. Approximate size of project: $678,000 Phase I & 2 |
|
Construction and Retrofit |
|
Energy Saving Performance Contracts (ESPC) |
